ENFRعربي
Request a briefing
Concept illustration of a Moroccan coastal town above a rocky shore at golden hour
Impact

Power for the coastthat lives from the sea.

Ports, fish farms and fishing villages need electricity right at the water's edge, and today much of it comes from diesel. TA9A Shark is built for them.

Who it is for

The people who work the water.

Off-grid ports and fishing cooperatives along the coast still pay for diesel. That is our customer, and our competitor.

Ports and marinas

Lighting, pumps, pontoon power and the small loads that run day and night.

Harbour

Fish farms

Feeders, sensors and aeration on cages anchored offshore, where a grid cable rarely reaches.

Aquaculture

Fishing cooperatives

Cold rooms, ice and light on the quay, so the catch keeps its value.

Cooperative

Coastal villages and remote sites

Homes, telecom masts and monitoring stations at the end of the line.

Community

Concept illustration of fishermen unloading crates into a cooperative cold room at dusk
A day at the quay

Cold rooms that keep running when the boats come in.

At dusk the boats come back and the catch goes straight into cold storage. That fridge, the ice machine and the lights on the quay are what a cooperative pays diesel for.

A buoy a short distance offshore can feed that load from the sea it sits in: the swell, the tide and the sun, whichever is there that day.

Where we start

The northern coast, from Tangier.

We are based in Tangier, on the Strait of Gibraltar, and our pilot is planned at a coastal site nearby. The Mediterranean coast to the east is next.

Made in Morocco. Powered by the sea. Built for the world.

Map of Morocco, including its southern provinces, with Tangier, Tetouan, Al Hoceima and Nador marked on the northern coast
Morocco. Our start is the northern coast; the exact pilot location is not shown.
Two ways to work with us

Own the buoy, or just buy its power.

Option 1

Buy the unit

You own the machine and the energy it makes.

Option 2

Buy the electricity

We own and maintain the machine, and you pay for the electricity it delivers.

Prices come with a site quote, once we know the location and the load. Service tariffs are not agreed yet.

What we will measure

We will report what the pilot actually does.

Energy delivered

Metered from the day the unit is commissioned, against the sea state.

At the pilot

Diesel avoided

Measured at the site it powers, not estimated from a model.

At the pilot

Service record

Every inspection, cleaning and repair, logged and shared with partners.

At the pilot

We publish these results when we have them. Until then, the site shows no output figures.

Next · RecognitionFirst Prize, Green Up Morocco 2026 →