€600,000 to putthe first unit in the water.
Every euro goes towards one thing we can show you: a measured output record from the sea.
All milestones are targets. A full year of sea data needs 12 months after commissioning, so the complete record arrives after month 18.
The risks, stated plainly.
Storm loads
The design has a defined safe state for storms.
Structural tests and load validation.
Fouling and corrosion
Sealed housings and replaceable parts.
Exposure tests and service records.
Permits
A site-specific authorisation process.
Safety studies and permit dossiers.
Output below the model
Output metered against the sea state.
Continuous metering at every pilot site.
These mitigations are design intent, not proven performance. If output comes in lower, every unit is worth less. The raise pays for finding out.
After the pilots. Morocco first. An indicative €1.2M round to expand across the Mediterranean comes only after metered output, a service record and paid contracts. Investment terms are shared in the briefing, subject to legal review.
Contribute directly.
Direct contributions pay for engineering work between prototypes and pilot sites. A share of every donation goes to the coastal communities the technology is built for.
A donation is separate from the €600,000 investment round. It carries no equity, no return and no decision rights. The coastal community share is tracked internally for now; a public accounting comes once partner villages are selected.