ENFRعربي
Request a briefing
Invest

€600,000 to putthe first unit in the water.

Every euro goes towards one thing we can show you: a measured output record from the sea.

Use of funds · 18 months
Engineering and validationFull-size prototype, sealing and structural tests
€220,000
Pilot deploymentsBuild, install and monitor at 3 to 5 sites
€180,000
Authorisations and safetyStudies, permit dossiers and compliance work
€140,000
Data and monitoringMetering, telemetry and client reporting
€60,000
Milestones
Months 0 to 4Design freeze and a costed bill of materials.
Months 4 to 9First full-size unit at the pilot site near Tangier. Metering starts at commissioning.
Months 9 to 15Deployment at 3 to 5 pilot sites.
Months 15 to 18First paid contracts.

All milestones are targets. A full year of sea data needs 12 months after commissioning, so the complete record arrives after month 18.

What the pilots have to settle

The risks, stated plainly.

Storm loads

The design has a defined safe state for storms.

Structural tests and load validation.

Fouling and corrosion

Sealed housings and replaceable parts.

Exposure tests and service records.

Permits

A site-specific authorisation process.

Safety studies and permit dossiers.

Output below the model

Output metered against the sea state.

Continuous metering at every pilot site.

These mitigations are design intent, not proven performance. If output comes in lower, every unit is worth less. The raise pays for finding out.

After the pilots. Morocco first. An indicative €1.2M round to expand across the Mediterranean comes only after metered output, a service record and paid contracts. Investment terms are shared in the briefing, subject to legal review.

Next · ContactRequest a briefing →